Toolkit on the Appraisal of Small Renewable Energy Projects : Tanzania Case Study

ACCESS TO MODERN ENERGY ACCOUNTING ALTERNATIVE ENERGY AMOUNT OF POWER APPROACH ARBITRATION ASSET CLASSES AVAILABILITY BALANCE BALANCE SHEET BALANCE SHEETS BANK POLICIES BANK POLICY BANKING PRACTICES BED COMBUSTOR BIOGAS BIOLOGICAL OXYGEN DEMAND BIOMASS BUDGETING CAPACITY BUILDING CAPACITY FACTOR CAPITAL INVESTMENT CARBON DIOXIDE CARBON FINANCE CASH FLOW CASH INFLOWS CASH RESERVE CLEAN ENERGY CLIMATE CHANGE COGENERATION COLLATERAL COMMERCIAL BANKING COMMERCIAL BANKS COMMERCIAL TERMS CONSTRUCTION COST CONSUMER PRICE INDEX CONTRACTUAL OBLIGATIONS COST OF ENERGY COST OF FEEDSTOCK COST PER KILOWATT COUNTRY RISK CREDIT GUARANTEE CREDIT LINE CREDIT LINES CREDIT POLICIES CREDIT RISK CREDITORS CURRENCY DEBT DEBT CONTRACT DEBT FINANCING DEBT SERVICE DEBT SERVICES DEBT SERVICING DEBT-EQUITY DEVELOPMENT BANK DEVELOPMENT FINANCE DIESEL DISBURSEMENT DISBURSEMENTS DISPUTE RESOLUTION DISTRIBUTION NETWORK DUE DILIGENCE ECONOMIC RISKS ELECTRIC POWER ELECTRIC SUPPLY ELECTRICITY ELECTRICITY GENERATION ELECTRICITY SALES ELECTRIFICATION EMISSION EMISSIONS EMISSIONS REDUCTIONS ENABLING ENVIRONMENT ENERGY DEVELOPMENT ENERGY EFFICIENCY ENERGY GENERATION ENERGY MARKETS ENERGY OUTPUT ENERGY PLANNING ENERGY PRODUCTION ENERGY SOURCES EQUIPMENT EQUITY CONTRIBUTIONS EQUITY FUNDS EQUITY INVESTMENT EQUITY INVESTMENTS ESCROW EXCHANGE RATE EXCHANGE RATES EXPENDITURE EXPENDITURES EXTERNAL DEBT FEEDSTOCK AVAILABILITY FINANCIAL INSTITUTIONS FINANCIAL RISKS FIXED ASSET FIXED ASSETS FIXED INTEREST FIXED INTEREST RATE FLOOR PRICE FOSSIL FOSSIL FUELS FUEL FUTURE CASH FLOWS GENERATING CAPACITY GRACE PERIOD GREENHOUSE GAS GREENHOUSE GAS EMISSIONS GRID CONNECTION GRID ELECTRICITY GRID EXTENSION HEAT HYDRO-POWER HYDROELECTRIC PLANT HYDROELECTRIC PLANTS HYDROPOWER INCOME TAX INDEBTEDNESS INFLATION INFLATION RATES INFLATIONARY PRESSURE INFORMATION DISSEMINATION INSURANCE INSURANCE POLICIES INTANGIBLE INTANGIBLE ASSETS INTEREST PAYMENT INTEREST RATE INTEREST RATE SPREAD INTEREST RATE VOLATILITY INTEREST RATES INTERNAL RATE OF RETURN INTERNATIONAL BANK INTERNATIONAL DEBATE INTERNATIONAL DEVELOPMENT INTERNATIONAL FINANCE INVESTMENT BANK INVESTMENT FUNDS KILOWATT HOUR KINETIC ENERGY LACK OF COLLATERAL LAND TITLE LEGAL FRAMEWORK LEGAL FRAMEWORKS LENDER LENDERS LIABILITY LOAN LOAN AGREEMENT LOAN APPLICATIONS LOAN OFFICERS LOCAL FINANCIAL INSTITUTIONS LOCAL GOVERNMENTS LONG-TERM LOANS MACROECONOMIC VARIABLES MARKET CONDITIONS MARKET DEVELOPMENT MARKET MECHANISM MARKET RISK MARKET VALUE METHANE MICROFINANCE MICROFINANCE INSTITUTION OXYGEN PAYMENT OBLIGATIONS PAYMENT OF INTEREST PIPELINE POLITICAL RISK POWER GENERATION POWER GENERATION CAPACITY POWER MIX POWER PRODUCER POWER PRODUCERS POWER PROJECT POWER PURCHASE AGREEMENTS POWER STATION PRINCIPAL PAYMENT PRINCIPAL PAYMENTS PRIVATE INVESTMENTS PURCHASE OF ELECTRICITY REGULATORY AUTHORITY REGULATORY FRAMEWORK RENEWABLE ENERGY RENEWABLE ENERGY DEVELOPMENT RENEWABLE ENERGY PROJECTS RENEWABLE ENERGY RESOURCES RENEWABLE POWER REPAYMENT REPAYMENT CAPACITY RESERVE RESERVES RETAIL CUSTOMERS RETURNS RISK FACTORS RISK PREMIUMS RURAL ENERGY SAFE INTERCONNECTION SAND SHAFT POWER SHORT-TERM GOVERNMENT SECURITIES SMALL POWER PRODUCERS SOLAR ENERGY SOLAR HOME SYSTEMS SOLAR PROJECTS SUSTAINABLE ENERGY TAX TAX PAYMENTS TAX RATE THERMAL PLANTS TONS OF CARBON TOTAL DEBT TRANSMISSION LINE TRANSMISSION LINES TRANSMISSION LOSSES TRANSMISSION SYSTEM TREASURY TREASURY BILL TREATIES TRUST FUND TURBINE TURBINE GENERATOR TURBINE GENERATORS UTILITIES VALUE OF ENERGY WIND WIND FARMS WIND POWER WIND SPEED WIND TECHNOLOGY WORKING CAPITAL
138
0

Attachments [ 0 ]

There are no files associated with this item.

More Details

Washington, DC
Africa | Tanzania
2014-04-07T19:36:50Z | 2014-04-07T19:36:50Z | 2012-07

Following this introductory chapter, chapter two continues with a general description of the regulatory, institutional, and policy environment for Renewable Energy (RE) in Tanzania. The chapter describes the main existing institutional arrangements in place and shows that the country's legal framework is conducive to private sector RE initiatives. Chapter three discusses the fundamentals of project finance, the basic components of financial analysis, and common due diligence factors concerning RE investments. This discussion provides a framework for a better understanding of RE financing, which from a banker's point of view requires a different approach than the more traditional balance sheet-focused financing. Chapters 4 through 8 go over each of the most common RE technologies: chapter four: Hydropower; chapter five: biomass; chapter six: biogas; chapter seven: solar PV; and chapter eight: wind. Each of the chapters discusses both the basic technical and financial aspects of the technologies. Each chapter will provide the reader with a basic understanding of the technology in question and the associated financial challenges. In the chapters on hydropower (chapter four) and biomass (chapter five), a financial 'back-of-the-envelope' model is included as well.

Comments

(Leave your comments here about this item.)

Item Analytics

Select desired time period